Sonoran Think Tank
Subscribe
Sign in
Home
Notes
Archive
About
Latest
Top
Discussions
The Bill Comes Due
How the AI infrastructure boom is being built on economic sand, and what that means for the communities asked to absorb its costs
Jun 2
•
Colin Mellars
6
2
3
May 2026
Measuring the Wrong Sound
Why the standard noise test used in most local ordinances misses almost everything a data center actually produces.
May 30
•
Colin Mellars
7
5
5
The Loophole in the Water Wall
How Arizona Law Turns Municipal Refusals Into Groundwater Permits
May 28
•
Colin Mellars
5
4
Before the Forum
What to Listen For When Marana Candidates Talk About Development, Revenue, and the Pattern Voters Keep Noticing
May 21
•
Colin Mellars
6
2
When the Numbers Do Not Add Up:
A Technical Reading of the Vineland Data Center EIS
May 18
•
Colin Mellars
5
1
When the Servers Move In
A Field Guide for Residents and Advocates Confronting Hyperscale Data Center Development
May 16
•
Colin Mellars
8
3
1
The Data Center Boom Is a Bet on Revenue That Doesn’t Exist Yet
A technical look at the infrastructure cycle, the scaling law problem, and what happens if the revenue doesn’t show up.
May 14
•
Colin Mellars
3
When Common Zoning Tools Fail At Scale
Why regulators need to shift their thinking on historical tools for managing industrial projects.
May 12
•
Colin Mellars
4
2
Support for Surprise, AZ
Technical Brief Supporting Resident Pushback in Surprise
May 7
•
Colin Mellars
1
5
A Rebuttal to the Goldwater Institute’s Data Center Playbook
Technical analysis of the talking points.
May 5
•
Colin Mellars
13
8
2
The Closed Loop Cooling Chemistry Problem
Closed-Loop Cooling and the Upper Santa Cruz Watershed
May 2
•
Colin Mellars
6
11
2
April 2026
Cooling Tower Loop Hole
A critical gap in Marana's current ordinance structure
Apr 30
•
Colin Mellars
3
4
1
This site requires JavaScript to run correctly. Please
turn on JavaScript
or unblock scripts